Dredging Begins At Saquatucket
By: Alan Pollock
HARWICH PORT — Painstakingly, one boatload at a time, a contractor has begun to dredge Saquatucket Harbor. The work began last week, and as of Monday morning, two scows filled with silty sand had been removed from the harbor, leaving about 22 loads to go. Working from a barge, crews use a large excavator fitted with a clamshell scoop to remove the dredged material, loading it on special barges. The work is m...