Gas Line Snafu Sets Back W. Chatham Project
By: Tim Wood
CHATHAM – An error in the installation of natural gas lines will set the Route 28 West Chatham Roadway Project back by at least four months. Gas lines along about 900 feet of roadway, where the two roundabouts are to be built at the intersections of Barn Hill Road and George Ryder Road, were not installed to the required depth. Rather than tear up the existing gas lines and replace them at the correct depth, o...